by Justin GephartMarch 1, 2024
McGuire Sponsel Cost Segregation

Beverage Distribution Center

Client Profile & Study Results
McGuire Sponsel was recently engaged to perform a Cost Segregation study on a newly built $16 million distribution facility in North Carolina.

Our team kicked off the study by conducting a tour of the 168,000 square foot facility. Based on the detailed site visit and subsequent calculations using blueprints and invoices, McGuire Sponsel was able to successfully reclassify over 30 percent of the construction costs into 5 and 15 year property. This generated an increase to the first year cash flow in excess of $1.3 million with a net present value of cash flows over the life of the investment exceeding $840,000.

Interested in a free cost benefit analysis for a potential cost seg study?

Call us at +1-800-322-7776 or fill out the form below.